-
June 21, 2023
This project comprised of the replacement of the existing athletic track surface with a Class 2 IAAF Prefabricated Running Track including new double long jump and triple jump facilities, hammer and discus throwing facilities, indoor sprint track, po …
-
May 24, 2023
TOBIN Consulting Engineers provided Civil & Structural Consultancy services along with PSDP services on 21 social residential units including 6 No. 1 bed, 13 No. 2 bed and 2 No. 3 bed dwellings for Meath County Council. Services provided by TOBIN …
-
April 17, 2023
This new modern Primary Healthcare Facility in the Grange is a single-storey 9860 sq. ft building. It features all necessary staff rooms and offices, open reception area with a waiting room, GP and nurses’ rooms, therapy rooms, a physio gym and physi …
-
March 29, 2023
TOBIN Consulting Engineers provided PSDP services on the recently completed Ward River Valley Park. This Recreational Hub is part of the 200-acre Ward River Regional Park and features newly developed grass pitches as well as a third-generation all-we …
-
February 17, 2023
This project consisted of the provision of new office and laboratory space within their existing facility, as well as a plant room and compound, an external carpark, and other site infrastructure. The project entailed the delivery of the following fr …
-
January 16, 2023
TOBIN Consulting Engineers was delighted to be involved in the Irish National Stud’s Entrance Building Extension project, where we provided Civil & Structural Consultancy Services. This project involved the construction of a new extension to the …
-
November 2, 2022
This development consisted of refurbishment and alterations to the existing buildings of Bay 135 and 137 at Shannon Free Zone, Shannon Airport, Co. Clare. The original buildings consist of a reinforced concrete frame with prestressed large-span rafte …
-
October 6, 2022
Works comprised of the construction of a 10,405m², 1000-pupil Post-Primary school in Naas which includes teaching accommodation, a PE hall, a special needs unit with a sensory garden, 3 ball courts and an all-weather pitch. The school is a BER A3 ene …
-
September 13, 2022
The two-storey building initially built in 1999, is now operational and the works consisted of approximately 1800m2 of fit-out, fire safety upgrade works and improvements to the existing car park. The office supplements Ryanair DAC`s existing corpora …