-
February 17, 2023
This project consisted of the provision of new office and laboratory space within their existing facility, as well as a plant room and compound, an external carpark, and other site infrastructure. The project entailed the delivery of the following fr …
-
February 23, 2022
The works involved the refurbishment and fit-out of the ground, first & second floors and extension to the Piscatorial School, Galway City. The new fit-out of the building provides office space, a canteen and all associated furniture, fixtures an …
-
December 8, 2021
The completion of the Aran Sweater Market project in July 2018 marked an important social, cultural and economic development for the famous Medieval Quarter of Galway city. This significantly important project is the result of an extensive conservati …
-
July 15, 2021
TOBIN Consulting Engineers is proud to have delivered the world’s largest Sports Air Dome for Connacht GAA in Bekan, Co. Mayo. The Smart Air Dome is located on the site of the Connacht GAA ‘Centre of Excellence’ and measures 150m (l) x 100m (w) x 26m …
-
July 6, 2021
This state-of-the-art facility included the development of three individual areas: The National Indoor Training Centre, the National Gymnastics Training Centre and the National Indoor Athletics Training Centre. This fully accessible, multi-sport and …
-
July 5, 2021
The National Indoor Arena houses three indoor arenas, each one as impressive as the next. The arena has a signature structure that ranges in height from 12 to 17 metres over three levels. Phase 2 of the National Indoor Arena provides permanent indoor …
-
August 8, 2020
TOBIN’s work with the Shannon Airport Authority (SAA). Shannon Airport, located in County Clare, is one of only three international airports in Ireland. The Shannon region in the west of Ireland is synonymous with FDI investment and expansive multina …
-
March 25, 2020
Covering a total area of 35,000m², this project involved the provision of 2 full-size GAA pitches, 4 soccer pitches, 1 natural turf pitch, 2 ball walls, a spectator terrace area, floodlighting, access roads, coach parking and set down areas, site ser …
-
February 8, 2020
This project consisted of the construction of a 329m² ground floor area extension to the existing receiving area including the provision of 2 no. additional loading docks and all associated siteworks and was completed on Jan 2020. An existing roller …