-
August 8, 2022
This project consists of the demolition of the two existing ‘Marine View’ two-storey apartment blocks and the construction of a new five-storey apartment block and ancillary structures including a refuse compound, bicycle shed and comms room. The sit …
-
June 17, 2022
This development consisted of the construction of 26 no. housing units at Rahan Road Co. Offaly, including three-bed terraced houses and three-bed semi-detached houses, all of which are A-rated. Services provided by TOBIN Consulting Engineers on this …
-
November 25, 2021
TOBIN Consulting Engineers is delighted to be involved in the development of the mixed-use scheme located in the Northern suburbs of Galway City. The development is arranged across 12 no. development blocks (a-m) ranging in height from 2 to 8 storeys …
-
November 19, 2021
This development consisted of the construction of 40 no. housing units in total, including all site development works and the construction of 2 new entrances via the Headfort Grove/Headfort Park access road and the Blackthorn Grove development. The u …
-
November 15, 2021
The Residential and Commercial Development at Monivea Road, Galway for Greenway Properties Ltd. includes the construction of 54 No. 3 and 4- bedroom timber frame dwellings in addition to a commercial development and all associated civil works includi …
-
September 24, 2021
This project involved the construction of 54 No. new residential units as part of an overall masterplan for the area. Designs including balconies / terraces, comprising of 16 No. apartments ranging between 3 – 5 storeys in height and 38 No. terraced …
-
September 7, 2021
This development comprised of the construction of 340 units which are a large variety of new housing styles including apartments (102), duplex complexes (102), detached and semi-detached houses (136), all carefully positioned to fully appreciate and …
-
July 23, 2021
This development is a mixed residential development of detached, semi-detached, terraced properties and apartments, consisting of a total of 195 units. The development was designed to comply with the current Building Regulations and the site develop …
-
July 8, 2021
This project consisted of the demolition of 30 existing houses; the construction of 40 residential dwelling units to include two-bedroom and three-bedroom houses, associated parking and open space and the refurbishment of 21 units at Gilmartin Road, …