-
October 25, 2022
In September 2022, Castlebanny Wind Farm was granted planning permission by An Bord Pleanála, and TOBIN Consulting Engineers were delighted to be the Lead Planning & Environmental Consultants on this project for FuturEnergy Ireland and ART Genera …
-
October 25, 2022
TOBIN Consulting Engineers was appointed to provide Planning and Environmental services for the proposed development of the Bord na Móna Energy Park. This project will incorporate 200 MW+ of low to zero-carbon electricity generation from sources whic …
-
October 24, 2022
Codling Wind Park Limited is proposing to develop the Codling Wind Park Project, an offshore wind farm located in the Irish Sea approximately 13-22km off the east coast of Ireland, at County Wicklow. Codling Wind Park is a 50:50 joint venture betwe …
-
October 20, 2022
TOBIN Consulting Engineers was appointed to secure planning permission for the Trascan Solar Farm. The proposed development consists of a 60-megawatt (MW) solar farm comprising of photovoltaic panels on ground-mounted frames and a 110 kiloVolt (kV) s …
-
October 20, 2022
The TOBIN Ecology team examined the potential ecological impacts (such as habitat loss, habitat damage/disturbance, disturbance to species and potential pollution of surface water) of the proposed Mothel Solar Farm development with regard to flora an …
-
October 20, 2022
The project consisted of 24 No. wind turbines, a substation, BESS and a proposed amenity park. From 2016 to 2019, the team undertook a range of environmental and engineering assessments and surveys within and surrounding the boundary of the proposed …
-
October 5, 2021
The town of Templemore has a long history of flooding as it lies on the Mall River which drains a catchment area of 22km2 that includes parts of the Kilduff and Devilsbit Mountains, before flowing into the River Suir two kilometres further downstream …
-
July 12, 2021
Client: Irish Water Key Facts: Irish Water is responsible for delivering secure, reliable and sustainable water supplies. Extensive studies have been undertaken to identify and assess supply options. Abstraction of water from Parteen Basin, nearby t …
-
July 10, 2021
Client: Elgin Energy Services Ltd. Key Facts: Goresbridge solar farm consists of solar photovoltaic (PV) panels laid out in arrays across two fields (approximately 11.34ha). The development will help the country meet its 40% renewable energy targets …