• October 14, 2020

    TOBIN Consulting Engineers was appointed to act as consulting engineers for the €16.3M upgrade of the wastewater treatment facilities and to provide the following technical services: Structural design of buildings and services Provision of FSC and DA …

  • October 14, 2020

    TOBIN Consulting Engineers was appointed to act as consulting engineers for the upgrade works to provide for water supply from production wells with UV treatment and storage.  Capacity 1,860m³/d and to provide the following technical services: Struct …

  • October 13, 2020

    TOBIN Consulting Engineers was appointed to act as consulting engineers for the production wells with chlorination, fluoridation, UV treatment and storage.  Capacity 65 – 80m³/hr and to provide the following technical services: Civil and Structural d …

  • October 13, 2020

    TOBIN Consulting Engineers was appointed to act as consulting engineers for the design and construction of a new water treatment plant including new access road to cater for the designed population equivalent of 2,400PE/a and to provide the following …

  • crossdoney
    October 6, 2020

    In March 2017, TOBIN was employed by Crossdoney GWS (Co. Cavan) to undertake a process review of the existing water treatment installation. Crossdoney GWS was one of four GWS included in the South-West Cavan DBO Bundle. TOBIN Consulting Engineers wer …

  • Stoneyford
    October 6, 2020

    TOBIN Consulting Engineers carried out Designer Services for Stoneyford Wastewater Treatment Plant Upgrade including flood risk assessment and relocation of infrastructure and M&E equipment above flood level. The existing wastewater treatment wor …

  • interreg swell
    March 24, 2020

    The INTERREG VA Programme is one of over 60 funding programmes across the European Union that have been specifically designed to address problems that arise from the existence of borders. The programme’s aim is to stimulate cross border co-operation …

  • omeath sewerage scheme
    March 24, 2020

    A Preliminary Report was undertaken by TOBIN in 2012 to determine the best location for the treatment of wastewater from the Omeath Agglomeration and to identify the extent of works required to rehabilitate and upgrade the existing wastewater collect …

  • costelloe
    February 26, 2020

    The Costelloe Regional Water Supply Scheme was procured in two contracts, a DBO contract for the lake impoundment, abstraction works and treatment (Contract 3), and an Employer Design contract for pipelines and reservoirs (Contract 2).  Contract 2 co …