• Stoneyford
    October 6, 2020

    TOBIN Consulting Engineers carried out Designer Services for Stoneyford Wastewater Treatment Plant Upgrade including flood risk assessment and relocation of infrastructure and M&E equipment above flood level. The existing wastewater treatment wor …

  • wastewater
    March 24, 2020

    In Ireland, wastewater from approximately 500,000 houses is treated by on-site treatment systems. It is essential in the interests of public health to ensure the safe disposal of wastewater from a development. A site assessment will determine whether …

  • omeath sewerage scheme
    March 24, 2020

    A Preliminary Report was undertaken by TOBIN in 2012 to determine the best location for the treatment of wastewater from the Omeath Agglomeration and to identify the extent of works required to rehabilitate and upgrade the existing wastewater collect …

  • lough mask
    February 26, 2020

    A Water Order secured under the 1942 Water Supplies Act gave the right to abstract up to 54,145m3 of water per day from Lough Mask. The phased development involved the provision of a supply connection to Westport Town from the Lough Mask Regional Wat …

  • costelloe
    February 26, 2020

    The Costelloe Regional Water Supply Scheme was procured in two contracts, a DBO contract for the lake impoundment, abstraction works and treatment (Contract 3), and an Employer Design contract for pipelines and reservoirs (Contract 2).  Contract 2 co …

  • letterkenny hospital
    February 26, 2020

    In July 2013, following intense rainfall in the area, flooding occurred in parts of Letterkenny General Hospital. The source of the flood water was a local stream known as the Sprackburn Tributary (a tributary of the River Swilly), which runs towards …

  • Swords Watermain
    November 25, 2019

    As the age-old proverb suggests, necessity is indeed the ‘mother of invention’, and within a construction and engineering context particularly, we have seen time and time again that the primary driving force for innovation is the need to resolve a re …

  • Lisheen Wind Farm
    June 10, 2019

    As part of the planning application for the Lisheen III Wind Farm development, TOBIN Consulting Engineers were commissioned to carry out a Site-Specific Flood Risk Assessment (FRA) of the proposed works. The FRA has been prepared in accordance with t …

  • June 10, 2019

    TOBIN Consulting Engineers were commissioned by Elgin Energy to carry out a Flood Risk Assessment on a solar farm located in County Kilkenny approximately 2km west of Ballyragget Town. The Flood Risk Assessment was carried out in accordance with a st …