• October 14, 2020

    TOBIN Consulting Engineers was appointed to act as consulting engineers for the €16.3M upgrade of the wastewater treatment facilities and to provide the following technical services: Structural design of buildings and services Provision of FSC and DA …

  • October 14, 2020

    TOBIN Consulting Engineers was appointed to act as consulting engineers for the upgrade works to provide for water supply from production wells with UV treatment and storage.  Capacity 1,860m³/d and to provide the following technical services: Struct …

  • October 14, 2020

    TOBIN Consulting Engineers was appointed to act as consulting engineers for the upgrade works to provide for water supply from production wells with UV treatment and storage.  Capacity 1,860m³/d and to provide the following technical services: Struct …

  • October 13, 2020

    TOBIN Consulting Engineers was appointed to act as consulting engineers for the production wells with chlorination, fluoridation, UV treatment and storage.  Capacity 65 – 80m³/hr and to provide the following technical services: Civil and Structural d …

  • October 13, 2020

    TOBIN Consulting Engineers was appointed to act as consulting engineers for the design and construction of a new water treatment plant including new access road to cater for the designed population equivalent of 2,400PE/a and to provide the following …

  • October 13, 2020

    TOBIN Consulting Engineers provided project management and programming, Full Engineering Services, Employer’s Representative, financial management and cost control, pre-planning, the procurement and administration of third party investigative surveys …

  • greater dublin drainage
    March 24, 2020

    Proposed Regional Wastewater Treatment Plant (WwTP) to cater for 500,000 population equivalent (PE); Associated outfall pipeline and orbital sewer linking the proposed WwTP to the existing regional sewer network and to provide future connections for …

  • wastewater call offs
    March 24, 2020

    The Irish Water 2017-2021 Investment Plan identified 52 No. Wastewater ‘Above Ground’ treatment projects where upgrade works are to be implemented through Irish Water’s gateways from conceptual design, on to construction and project closure. For the …

  • alexion
    March 24, 2020

    Installation of approximately 660m of watermain to connect a commercial customer (Alexion) to the water network. Preferred design includes trenchless technology, open cut trenching and lift and lay installation methods Provision of a radio link to in …