In

The €12m GAA ‘National Games Development Centre’ was officially opened at the National Sports Campus on Saturday 2nd April 2016.

This nationally important project for the GAA includes a total of five playing pitches, four of them full size and all of them floodlit, a 3G pitch, a highly innovative hurling wall and a pavilion which houses 10 dressing-rooms, a reception area, a gymnasium, associated facilities for physiotherapy, referee rooms, meeting rooms and dining facilities. Furthermore, the building makes use of the latest sustainable energy options to reduce the running costs on a life cycle basis. A covered seated spectator area adjoining the pavilion can cater for 400 people.

GAA National Games Development Centre

This National Games Development Centre will play a pivotal role in increasing participation and improving the performance of individuals (players, coaches, administrators, personnel etc.) within the GAA for the benefit of both the association and the individuals.

TOBIN Consulting Engineers provided the following services for this project:

  • Technical Advisor
  • Project Management
  • Civil Engineering
  • Structural Engineering

Start typing and press Enter to search

FAI National Sports CampusHigh Performance Training Centre