In

The existing R498 at Latteragh is a single carriageway section which follows the contours around the Latteragh hills, adjacent to the meanders in the Nenagh River. This has led to the road having a sub-standard cross-section and has resulted in numerous collisions.

TOBIN Consulting Engineers has developed the scheme in accordance with Transport Infrastructure Ireland (TII) publication Project Management Guidelines (PMG) through Phases:

  • Phase 2 Route Selection
  • Phase 3 Design
  • Phase 4 Environmental Assessment Reports and Statutory Process.

TOBIN established the constraints for the area, developed assessed route options for improvement, assessed the preferred route, prepared the Part 8 Planning and Environmental documents and post Part 8 approvals and prepared the CPO drawings and schedules.

The R498 Road Realignment at Latteragh is approximately 4.5km in length to improve the narrow substandard road with a Type 3 Single Carriageway cross-section.

Scope of Services

The Scope of Service provided include:

  • Project Management, including financial and funding updates;
  • Stakeholder Consultations (including elected members of Tipperary County Council, NPWS, Inland Fisheries, OPW, An Taisce, Landowners);
  • Project Appraisal, (including Traffic Modelling, Cost-Benefit Analysis, and preparation of the Project Appraisal Report in accordance with the TII Project Appraisal Guidelines);
  • Public Consultations;
  • Part 8 Planning;
  • Environmental Assessment, (including AA and EIAR Screening);
  • Landowner Consultations;
  • Land Acquisition drawings and production of the CPO Drawings and Schedules;
  • Procurement of Topographical Survey;
  • Procurement, Administration and Site Supervision of Site Investigations;
  • Preliminary Design River Bridges;
  • Preliminary Design comprising:
    • Road Design;
    • Pedestrian and cycle facilities;
    • Priority Junction Design (including junction assessment);
    • Earthworks (significant soft soils);
    • Drainage (including attenuation ponds and culverts);
    • Utility diversions and new ducting;
    • Pavement Design;
    • Traffic Signs and Road Markings;
    • Accommodation Works;
  • Stage 1 Road Safety Audit;
  • Project Supervisor Design Process;
  • Design Process Traffic Management Plan

Services provided by TOBIN Consulting Engineers on this project:

Roads & Transportation Engineering           Project Management             PSDP

 

Start typing and press Enter to search

Roscommon DrainageTII Speed Limit Review