At TOBIN, we have over sixty years experience in conceptualising and delivering projects for our clients across the Building & Infrastructure, Energy & Environment and Water Services sectors.

  • June 12, 2019

    Faced with an unprecedented and indeed technical dilemma of sorts at Shannon Airport, Lufthansa Technik Shannon Ltd. approached TOBIN Consulting Engineers to find a way of accommodating a Boeing 787-8 at their maintenance base. The problem we faced h …

  • June 11, 2019

    TOBIN have been commissioned as the Lead Consultants for the R498 Road Widening at Knockalton. TOBIN’s scope of services on the project include: -Project Management -Preparation of Detailed Design -Contract Documents -Quantity Surveying -Procurement …

  • June 10, 2019

    EirGrid identified the need to reinforce the electricity network in the Grange Castle area of west Dublin, which was evolving as a major centre for hi-tec, power-dependent companies. Consequently, given the nature and activities of these companies, i …

  • June 10, 2019

    As part of the planning application for the Lisheen III Wind Farm development, TOBIN Consulting Engineers were commissioned to carry out a Site-Specific Flood Risk Assessment (FRA) of the proposed works. The FRA has been prepared in accordance with t …

  • June 10, 2019

    TOBIN Consulting Engineers were appointed to provide engineering and environmental consultancy services for the design and planning of the proposed Derryadd Wind Farm development in Co. Longford. The development includes of the following works: • Con …

  • June 10, 2019

    TOBIN Consulting Engineers were commissioned by Elgin Energy to carry out a Flood Risk Assessment on a solar farm located in County Kilkenny approximately 2km west of Ballyragget Town. The Flood Risk Assessment was carried out in accordance with a st …

  • June 10, 2019

    TOBIN Consulting Engineers were appointed to carry out an assessment of flood risk to the proposed Mothel Solar Farm in Curraghduff, County Waterford. The proposed development (the subject of this flood risk assessment report) will involve the constr …

  • June 7, 2019

    ENGINEERED LANDFILL DEVELOPMENT The permitted landfill development consisted of 15 No. phases, each approximately 2.5ha in area. TOBIN carried out detailed design, managed the tender process and carried out contract administration duties for Phase I …

  • June 7, 2019

    TOBIN Consulting Engineers are currently on board on the Templemore Flood Relief Scheme, designed by the Office of Public Works (OPW) in order to address the flooding problem in Templemore. The proposed scheme is in Templemore Town, County Tipperary. …

Call Us Today

We are based in Galway, Dublin, Castlebar and London. Follow us on LinkedIn and Twitter, for all of the latest TOBIN news and industry developments.

Start typing and press Enter to search