At TOBIN, we have 70 years experience in conceptualising and delivering projects for our clients across the Building & Infrastructure, Environment & Planning, Civil | Design Build | Water, and Roads and Transportation sectors.

  • Ardee Bypass
    June 6, 2019

    TOBIN Consulting Engineers were appointed by Louth County Council to undertake the Detailed Design and preparation of Tender documents for the proposed N52 Ardee Bypass. The proposed bypass commences in the townland of Mandistown in Co. Meath before …

  • June 6, 2019

    TOBIN Consulting Engineers acted as Lead Consultant for IT Carlow on the delivery of the new 31-acre South Sports Campus Development. Phase 1 of this world-class out door training facility consisted of the delivery of six full-size playing pitches, c …

  • June 6, 2019

    The Irish Rugby Football Union intend to develop 3 Outdoor Rugby Pitches, a 294m² Pavilion Building, a 96m² Maintenance Building, a 43.5m² ESB substation, and switch room, and other associated parking, roads and site services on the grounds of the Na …

  • June 5, 2019

    This project comprised of the construction of a modern, fit-for-purpose 600m² Primary Healthcare facility which includes a GP surgery, public health nursing area, a mental health room and a speech and language room. Services provided by TOBIN Consult …

  • May 30, 2019

    TOBIN were responsible for the completion of a 64 bed, 1500m² single storey nursing home with dementia care unit located at Clonberne, Co Galway, in an area without Local Authority services. The significant health and safety issues relating to this p …

  • January 30, 2019

    TOBIN Consulting Engineers were commissioned by HSE Estates to provide civil and structural design services in respect of emergency works at Letterkenny University Hospital. The works were required to allow the hospital manage the increase in patient …

  • October 16, 2018

    Over the past 10 years, TOBIN Consulting Engineers has acted as Lead Consultant to Connacht Rugby over a number of redevelopment projects across 5 different phases including: •New Floodlight for main pitch and training area •Clan Stand and Grant Thor …

  • National Horse Sport Arena
    August 7, 2018

    TOBIN acted as Lead Consultant of the multi-disciplinary team providing full PSDP services throughout this project. The arena is designed as both a High-Performance Training Centre for equestrian sport as well as being a facility that can be rented b …

  • High Performance Training Centre
    August 7, 2018

    The facility is a single-storey building and consists of an Indoor Training Area including a 4-lane 130-metre running track with performance analysis facilities, a dedicated boxing gym consisting of 4 training rings and one full-size competition ring …

Start typing and press Enter to search