At TOBIN, we have over sixty years experience in conceptualising and delivering projects for our clients across the Building & Infrastructure, Energy & Environment and Water Services sectors.
-
September 3, 2020
TOBIN Consulting Engineers provided Civil and Structural services for the Clúid Housing development in Dunlo, Ballinasloe. This new residential scheme is designed mainly for the elderly and will be a major boost for housing in Ballinasloe Town. TOBIN …
-
July 24, 2020
TOBIN was responsible for delivering the world’s largest Sports Air Dome for Connacht GAA in Bekan, Co. Mayo. This Double Skin Fabric Structure is located on the site of the Connacht GAA ‘Centre of Excellence’ and measures 150m (l) x 100m (w) x 26m ( …
-
March 24, 2020
TOBIN Consulting Engineers provided the Civil, Structural and Project Supervisor Design Stage for this development. The An Reilean residential development consisted of 176 units with a mix of detached, semi-detached and terraced houses, apartments, a …
-
March 24, 2020
Carlanstown Housing Development is being designed with an attenuation tank on site. Attenuation controls the flow of water as it is released back to the drainage system; this is a value added to this particular site as it has a high water table. Att …
-
March 24, 2020
TOBIN is employed by the Housing Agency to carry out surveys of properties which will be used to ease the current homelessness shortage in Ireland. The Housing Agency was set up in May 2010 to work with and support – local authorities approved housin …
-
March 24, 2020
Esker Park was constructed in 1983. It hosted multiple track and field events such as high jump, long jump, hammer and discus throwing, and steeplechase. The intent of the project is to remove and reuse and replace the existing whindust with a new sy …
-
March 24, 2020
The works will involve internal modifications to the existing Hangar Building which comprise of the demolition and removal of an existing internal wall of approximately 54 meters in length and 20 meters in height. The wall is constructed of block wor …
-
March 24, 2020
A new 110kV GIS station is required in the area near Kilbarry, Co. Cork to reduce reliance on the Kilbarry station and to facilitate on-going development in accordance with transmission security of supply standards. TOBIN in partnership with AECOM ha …
-
March 24, 2020
A rare opportunity exists in Mildenhall to bring together a range of public services on one site, making access easier and cutting costs. A project group, involving the potential partners, is now finalizing plans to create a ‘Mildenhall Hub’ with a v …