At TOBIN, we have 70 years experience in conceptualising and delivering projects for our clients across the Building & Infrastructure, Environment & Planning, Civil | Design Build | Water, and Roads and Transportation sectors.

  • westmeath
    February 26, 2020

    The Westmeath Water Conservation Project entailed a 3 stage approach to tackling the issue of unaccounted for water (UFW). Stage 1 involved putting Water Management Systems in place, District Meter Areas, to quantify the extent of the problem and sys …

  • letterkenny hospital
    February 26, 2020

    In July 2013, following intense rainfall in the area, flooding occurred in parts of Letterkenny General Hospital. The source of the flood water was a local stream known as the Sprackburn Tributary (a tributary of the River Swilly), which runs towards …

  • east galway landfill
    February 26, 2020

    Landfill facility of 60.8 hectares in size which was licensed by the EPA on 26th July 2004.  It has accepted waste since December 2005 at a rate of 100,000 tonnes per annum for disposal and up to 27,320 tonnes of engineering materials per annum for r …

  • Swords Watermain
    November 25, 2019

    As the age-old proverb suggests, necessity is indeed the ‘mother of invention’, and within a construction and engineering context particularly, we have seen time and time again that the primary driving force for innovation is the need to resolve a re …

  • June 10, 2019

    This project was implemented to improve the water quality of the River Boyne, to comply with the Urban Wastewater Treatment Directive and to improve the potential for continued development of the town. This project consisted of 2 phases. Phase 1 was …

  • Lisheen Wind Farm
    June 10, 2019

    As part of the planning application for the Lisheen III Wind Farm development, TOBIN Consulting Engineers were commissioned to carry out a Site-Specific Flood Risk Assessment (FRA) of the proposed works. The FRA has been prepared in accordance with t …

  • June 10, 2019

    TOBIN Consulting Engineers were commissioned by Elgin Energy to carry out a Flood Risk Assessment on a solar farm located in County Kilkenny approximately 2km west of Ballyragget Town. The Flood Risk Assessment was carried out in accordance with a st …

  • leixlip
    December 13, 2016

    TOBIN Consulting Engineers was appointed as Client’s Representative for the Stage 5 expansion of the Leixlip Water Treatment Plant. The expansion, with a capital cost of approximately €30 million, included the construction of a state of the art “stan …

  • November 18, 2016

    TOBIN Consulting Engineers, recognized for its expertise and knowledge of waste management, in association with a local firm based on Grand Cayman, provides an integrated range of services in wastewater treatment and waste management for the Cayman I …

Start typing and press Enter to search