At TOBIN, we have 70 years experience in conceptualising and delivering projects for our clients across the Building & Infrastructure, Environment & Planning, Civil | Design Build | Water, and Roads and Transportation sectors.

  • Hibernian House - Eyre Square Galway
    July 4, 2021

    Hibernian House was constructed in 1850 and stands with a distinctive limestone façade on the northern side of Eyre Square. TOBIN Consulting Engineers was proud to provide Project Management, Engineering and Design Consultancy services for the refurb …

  • July 3, 2021

    The Mick Lally Theatre is located along Courthouse Lane in Galway City. Part of Galway’s old city walls, which are protected, run through the Theatre. The works involved: Forming new opes in existing walls Forming an internal floor slab incorporating …

  • June 22, 2021

    TOBIN Consulting Engineers, in partnership with Land Use Consultants (UK) have been awarded the contract to prepare a Feasibility Study for a proposed greenway from Kilbeggan, to Mullingar. The project, which is funded under the 2020 Carbon Tax Fund, …

  • June 21, 2021

    This project comprised of the construction of 61 residential units consisting of a mixture of houses, apartments and a creche. The development is located along the coastline of Galway Bay and positioned between the village of Oranmore and the City of …

  • June 9, 2021

    This project involved the complete refurbishment and fire upgrade works of a small office unit (130m²) located in the Old Terminal Building of Shannon Airport. TOBIN were responsible for the detailed assessment of the existing unit to identify the re …

  • June 8, 2021

    TOBIN had responsibility for the Design from Planning Stage through to completion of all Civil and Structural works for this Primary Healthcare Building in Galway. Developed in 2008, the Faustino Building is a two-storey over double basement building …

  • May 22, 2021

    This project involved the initial inspection of 145 residential units in Nenagh, Co. Tipperary. Remedial works as identified by TOBIN Consulting Engineers were carried out on all units. As PSDP, TOBIN  liaised with the temporary works designers and a …

  • March 12, 2021

    The Dundalk Wastewater Treatment Plant was commissioned in 2000 for a design BOD capacity of 179,535p.e. TOBIN prepare a Preliminary Report which included: Examination of the performance of the existing wastewater treatment plant Assessment of the lo …

  • March 12, 2021

    This project consisted of the construction of 3 wastewater treatment plants at Donegal (12,000p.e.), Ballyshannon (7,400p.e.) and Rossnowlagh (4,000p.e.) which form the Donegal Wastewater Treatment Scheme Group A. TOBIN Consulting Engineers were appo …

Start typing and press Enter to search