At TOBIN, we have 70 years experience in conceptualising and delivering projects for our clients across the Building & Infrastructure, Environment & Planning, Civil | Design Build | Water, and Roads and Transportation sectors.
-
February 26, 2020
Over the course of the Longford Central RWSS scheme, two works contract were carried out which significantly improved the existing water treatment and water supply infrastructure. The first contract that was carried out involved the improvement of wa …
-
February 26, 2020
The Grid West Project is part of the National Grid 25 Programme. The 400kV scheme will form part of the electrical network necessary to connect an estimated 5,000MW of renewable energy resources available in the West of Ireland, as well as meeting th …
-
February 26, 2020
This project forms a fundamental element in catchment management. It makes sense to know where our water is coming from, particularly water for human consumption. The areas defined as source protection zones around public supply boreholes and springs …
-
February 26, 2020
The Costelloe Regional Water Supply Scheme was procured in two contracts, a DBO contract for the lake impoundment, abstraction works and treatment (Contract 3), and an Employer Design contract for pipelines and reservoirs (Contract 2). Contract 2 co …
-
February 26, 2020
The Westmeath Water Conservation Project entailed a 3 stage approach to tackling the issue of unaccounted for water (UFW). Stage 1 involved putting Water Management Systems in place, District Meter Areas, to quantify the extent of the problem and sys …
-
February 26, 2020
In July 2013, following intense rainfall in the area, flooding occurred in parts of Letterkenny General Hospital. The source of the flood water was a local stream known as the Sprackburn Tributary (a tributary of the River Swilly), which runs towards …
-
February 26, 2020
The Lough Atalia Road passes under a low 19th Century bridge. The bridge is comprised of cast iron arches and it is a protected structure. It is proposed to lower the road under the bridge to provide additional clearance for high-sided vehicles to s …
-
February 26, 2020
Landfill facility of 60.8 hectares in size which was licensed by the EPA on 26th July 2004. It has accepted waste since December 2005 at a rate of 100,000 tonnes per annum for disposal and up to 27,320 tonnes of engineering materials per annum for r …
-
February 26, 2020
TOBIN Consulting Engineers were proud to have formed part of the project team (Civil and Structural Engineers) which successfully delivered the award winning OPW Land Registry Offices, Roscommon. Through the use of innovative design techniques, the b …