At TOBIN, we have 70 years experience in conceptualising and delivering projects for our clients across the Building & Infrastructure, Environment & Planning, Civil | Design Build | Water, and Roads and Transportation sectors.

  • February 3, 2017

    TOBIN provided PSDP for Ennis Community College which included: 1. Construction Stage Health & Safety Plan 2. Inclusion of Risk Assessments and Method Statements for the works as they progress. 3. An updated construction management plan with site …

  • leixlip
    December 13, 2016

    TOBIN Consulting Engineers was appointed as Client’s Representative for the Stage 5 expansion of the Leixlip Water Treatment Plant. The expansion, with a capital cost of approximately €30 million, included the construction of a state of the art “stan …

  • November 18, 2016

    TOBIN Consulting Engineers, in our role as Project Manager and Lead Environmental Consultants, led the project team in the preparation of the planning application for submission to An Bord Pleanála under the SID process. In light of a significant inc …

  • November 18, 2016

    TOBIN Consulting Engineers’ role in the GPO’s 1916 Centenary Commemorations There are few locations in Ireland, if any, that hold the same level of historical resonance as the infamous GPO. The events at this location in 1916 changed the entire cours …

  • November 18, 2016

    TOBIN Consulting Engineers, recognized for its expertise and knowledge of waste management, in association with a local firm based on Grand Cayman, provides an integrated range of services in wastewater treatment and waste management for the Cayman I …

  • November 18, 2016

    TOBIN are acting as Ballinrobe Racecourse Committee’s main consultants for all developments at the Racecourse since 1980 with the most recent and final phase being completed in 2017 with significant redevelopment in earlier phases over the past 10 ye …

  • November 18, 2016

    TOBIN Consulting Engineers commissioned the first modern survey of the whole River Barrow navigation; over 68km from Athy in Co.Kildare, to the tidal reaches at St Mullins in Co Waterford. In sharing that survey with those who use and care for the wa …

  • November 18, 2016

    Following the intense flooding of the Dunkellin River in November 2009, TOBIN was appointed to design a scheme to alleviate flooding between Craughwell and Kilcolgan in County Galway. The works consist of: (1)    Channel deepening in Craughwell villa …

  • November 18, 2016

    TOBIN Consulting Engineers were commissioned in early 2015 by South Lakeland District Council to carry out Risk Assessments on 363 Private Water Supplies located in Cumbria. Approximately 1 million people in the UK are served by private water supplie …