At TOBIN, we have almost 70 years experience in conceptualising and delivering projects for our clients across the Building & Infrastructure, Environment & Planning, Civil | Design Build | Water, and Roads and Transportation sectors.

  • July 6, 2021

    This state-of-the-art facility included the development of three individual areas: The National Indoor Training Centre, the National Gymnastics Training Centre and the National Indoor Athletics Training Centre. This fully accessible, multi-sport and …

  • July 5, 2021

    The National Indoor Arena houses three indoor arenas, each one as impressive as the next. The arena has a signature structure that ranges in height from 12 to 17 metres over three levels. Phase 2 of the National Indoor Arena provides permanent indoor …

  • June 22, 2021

    TOBIN Consulting Engineers, in partnership with Land Use Consultants (UK) have been awarded the contract to prepare a Feasibility Study for a proposed greenway from Kilbeggan, to Mullingar. The project, which is funded under the 2020 Carbon Tax Fund, …

  • June 7, 2021

    TOBIN Consulting Engineers provided Civil, Structural, PSDP and Traffic Services on this project which consists of 40 No. unit residential development including a mix of houses and apartments units. The homes are between 1400 to 2000 sq ft. with dupl …

  • June 3, 2021

    This development consisted of the construction of 40 no. housing units in total, including all site development works and the construction of 2 new entrances via the Headfort Grove/Headfort Park access road and the Blackthorn Grove development. The u …

  • March 12, 2021

    The Dundalk Wastewater Treatment Plant was commissioned in 2000 for a design BOD capacity of 179,535p.e. TOBIN prepare a Preliminary Report which included: Examination of the performance of the existing wastewater treatment plant Assessment of the lo …

  • March 12, 2021

    This project was implemented to improve the water quality of the River Boyne, to comply with the Urban Wastewater Treatment Directive and to improve the potential for continued development of the town. This project consisted of 2 phases. Phase 1 was …

  • March 12, 2021

    This project consisted of the construction of 3 wastewater treatment plants at Donegal (12,000p.e.), Ballyshannon (7,400p.e.) and Rossnowlagh (4,000p.e.) which form the Donegal Wastewater Treatment Scheme Group A. TOBIN Consulting Engineers were appo …

  • March 9, 2021

    Tobin Consulting Engineers were appointed to prepare the detailed design and contract documents for the construction of a collection system and wastewater treatment facility for the village of Claregalway and for the procurement of an operations cont …