At TOBIN, we have almost 70 years experience in conceptualising and delivering projects for our clients across the Building & Infrastructure, Environment & Planning, Civil | Design Build | Water, and Roads and Transportation sectors.

  • July 6, 2021

    TOBIN Consulting Engineers provided full Civil & Structural Engineering and PSDP Services on this project which involved the retrofit of Bay 37 A & B, formerly known as the Boart building (which adjoins airport lands) to include for: ISO Clea …

  • July 6, 2021

    The hangar was designed to accommodate an A380 Aircraft among various other combinations of aircraft. The gross internal floor area of the hangar building is 8,447m² and includes office space, workshops, plant rooms and storage space. Ancillary build …

  • July 6, 2021

    This project involved the construction of 3 No. large scale light industrial units on the footprint of the original industrial/office units which had been demolished. The project entailed the design of the development with associated provision for ca …

  • July 6, 2021

    TOBIN provided Civil and Structural Design Services for the construction of the Westport Primary Care Centre in Co. Mayo. The total building footprint is approximately 2,450m² over part 2 / part 3 storey and is situated on a steeply sloping site encl …

  • July 6, 2021

    TOBIN provided Civil and Structural Engineering Design Services for the construction of a multi-storey Primary Care Centre comprising of a precast concrete frame structure at Coolock, Co. Dublin. The total building footprint is approximately 4,300m² …

  • July 6, 2021

    This state-of-the-art facility included the development of three individual areas: The National Indoor Training Centre, the National Gymnastics Training Centre and the National Indoor Athletics Training Centre. This fully accessible, multi-sport and …

  • July 5, 2021

    The National Indoor Arena houses three indoor arenas, each one as impressive as the next. The arena has a signature structure that ranges in height from 12 to 17 metres over three levels. Phase 2 of the National Indoor Arena provides permanent indoor …

  • June 22, 2021

    TOBIN Consulting Engineers, in partnership with Land Use Consultants (UK) have been awarded the contract to prepare a Feasibility Study for a proposed greenway from Kilbeggan, to Mullingar. The project, which is funded under the 2020 Carbon Tax Fund, …

  • June 7, 2021

    TOBIN Consulting Engineers provided Civil, Structural, PSDP and Traffic Services on this project which consists of 22 No. unit residential development including a mix of houses and apartments units. The homes are between 1400 to 2000 sq ft. with dupl …

Start typing and press Enter to search