At TOBIN, we have 70 years experience in conceptualising and delivering projects for our clients across the Building & Infrastructure, Environment & Planning, Civil | Design Build | Water, and Roads and Transportation sectors.

  • September 6, 2022

    This project consisted of the repurposing of an existing industrial unit in the Shannon Free Zone as a Control Centre and Workshop for the Future Mobility Campus which has been established across the Shannon Free Zone Area. Future Mobility Campus Ire …

  • August 11, 2022

    This project comprised of the refurbishment and upgrade of 2 buildings located at the Shannon Free Zone. Building 2 consisted of the construction of new clean rooms, office space, meeting rooms and staff welfare areas including associated MEP works, …

  • August 8, 2022

    This project consisted of the demolition of the two existing ‘Marine View’ two-storey apartment blocks and the construction of a new five-storey apartment block and ancillary structures including a refuse compound, bicycle shed and comms room. The si …

  • June 23, 2022

    As part of the overall proposed Inner Relief Road which includes approx. 1.1km of link road, footpaths & cycleways to connect to the existing 1.85km section of the Northern Inner Relief Road, the phase 1 works include Junction Upgrades and Signal …

  • June 22, 2022

    The Cathedral of the Assumption was built in 1827 – 37 on a hill overlooking Tuam and was the second Roman Catholic Cathedral (after Newry) to be built in Ireland after Catholic Emancipation. The building is built of limestone with buttresses, elabor …

  • June 17, 2022

    This development consisted of the construction of 26 no. housing units at Rahan Road Co. Offaly, including three-bed terraced houses and three-bed semi-detached houses, all of which are A-rated. Services provided by TOBIN Consulting Engineers on this …

  • February 23, 2022

    The works involved the refurbishment and fit-out of the ground, first & second floors and extension to the Piscatorial School, Galway City. The new fit-out of the building provides office space, a canteen and all associated furniture, fixtures an …

  • February 23, 2022

    The Project involved the refurbishment and fit-out of circa 500 sqm are of the existing warehouse to accommodate the Marine Research Institute (MRI). Works on the building comprised creating 2 No. roller doors and 2 No. personnel access doors to the …

  • December 9, 2021

    This project consisted of the restoration and refurbishment of an existing four-storey twentieth century Masonry schoolhouse building into four self-contained apartments on each of the 4 floor levels. This protected structure had many structural feat …