At TOBIN, we have 70 years experience in conceptualising and delivering projects for our clients across the Building & Infrastructure, Environment & Planning, Civil | Design Build | Water, and Roads and Transportation sectors.

  • November 15, 2021

    The Residential and Commercial Development at Monivea Road, Galway for Greenway Properties Ltd. includes the construction of 54 No. 3 and 4- bedroom timber frame dwellings in addition to a commercial development and all associated civil works includi …

  • October 5, 2021

    The town of Templemore has a long history of flooding as it lies on the Mall River which drains a catchment area of 22km2 that includes parts of the Kilduff and Devilsbit Mountains, before flowing into the River Suir two kilometres further downstream …

  • September 24, 2021

    This project involved the construction of 54 No. new residential units as part of an overall masterplan for the area. Designs including balconies / terraces, comprising of 16 No. apartments ranging between 3 – 5 storeys in height and 38 No. terraced …

  • September 16, 2021

    TOBIN Consulting Engineers were appointed by Kylemore Abbey and Gardens Ltd. in December 2020 to undertake an initial assessment of the existing water supply to the estate, and to prepare a Risk Assessment Report that identifies and ranks all potenti …

  • September 15, 2021

    TOBIN have carried out a review of the water supply infrastructure at Shannon Airport. This has included a review of the intake works, treatment plant, storage reservoirs and the distribution network. This report has identified some existing issues i …

  • September 7, 2021

    This development comprised of the construction of 340 units which are a large variety of new housing styles including apartments (102), duplex complexes (102), detached and semi-detached houses (136), all carefully positioned to fully appreciate and …

  • September 6, 2021

    This project involved the construction of 3 No. large scale light industrial units on the footprint of the original industrial/office units which had been demolished. The project entailed the design of the development with associated provision for ca …

  • September 1, 2021

    This project comprises of the construction of a 900mm Ogee Pipe to be laid in the dry channel starting at Shortt’s Bridge, which will collect the existing outfalls and connect them to an existing Foul Sewer pipe on the north side of Small’s bridge, f …

  • August 31, 2021

    The GO Sustainable Development Trust was established in response to the Government’s Project 2040 seminar ‘Empowering Communities in the fight against Climate Change’. After successfully securing funding, TOBIN Consulting Engineers were appointed to …