At TOBIN, we have over sixty years experience in conceptualising and delivering projects for our clients across the Building & Infrastructure, Energy & Environment and Water Services sectors.

  • Derryadd and Garryhinch Winter Bird Surveys
    July 10, 2019

    Client:  Bord na Móna   Key Facts: Garryhinch and Derryadd Proposed Wind Farm sites: Neither site is located within a European site, i.e. a SAC or SPA. The aim of the surveys is to assess the potential impact of the proposed wind farms on the lo …

  • Goresbridge Solar Farm
    July 10, 2019

      Client:  Elgin Energy Services Ltd.     Key Facts: The proposed solar farm consists of solar photovoltaic (PV) panels laid out in arrays across two fields (approximately 11.34ha). The development will help the country meet its 40% re …

  • Ballintubber Abbey
    June 25, 2019

    TOBIN Consulting Engineers were involved in the refurbishment of Ballintubber Abbey. The work involved a detailed survey of the Chapter House and 14th century doorway at Ballintubber Abbey, with a structural assessment of the capacity of the Chapter …

  • June 12, 2019

    Faced with an unprecedented and indeed technical dilemma of sorts at Shannon Airport, Lufthansa Technik Shannon Ltd. approached TOBIN Consulting Engineers to find a way of accommodating a Boeing 787-8 at their maintenance base. The problem we faced h …

  • June 11, 2019

    TOBIN Consulting Engineers has been commissioned to be the Lead Consultant for the R498 Road Widening at Knockalton. TOBIN’s scope of services on the project include: Project Management Preparation of Detailed Design Contract Documents Quantity Surve …

  • June 10, 2019

    EirGrid identified the need to reinforce the electricity network in the Grange Castle area of west Dublin, which was evolving as a major centre for hi-tec, power-dependent companies. Consequently, given the nature and activities of these companies, i …

  • Lisheen Wind Farm
    June 10, 2019

    As part of the planning application for the Lisheen III Wind Farm development, TOBIN Consulting Engineers were commissioned to carry out a Site-Specific Flood Risk Assessment (FRA) of the proposed works. The FRA has been prepared in accordance with t …

  • Derryadd Wind Farm
    June 10, 2019

    TOBIN Consulting Engineers were appointed to provide engineering and environmental consultancy services for the design and planning of the proposed Derryadd Wind Farm development in Co. Longford. The development includes of the following works: • Con …

  • June 10, 2019

    TOBIN Consulting Engineers were commissioned by Elgin Energy to carry out a Flood Risk Assessment on a solar farm located in County Kilkenny approximately 2km west of Ballyragget Town. The Flood Risk Assessment was carried out in accordance with a st …

Start typing and press Enter to search